top of page
Search

Lytton Park Residence is Finding Its Shape

  • Writer: Hyphen Studio
    Hyphen Studio
  • Nov 21, 2017
  • 1 min read

When the client came to us there was an existing design on the project which was rejected at COA (committee of adjustment).

Adding any new variance to the case could endanger it at OMB (Ontario municipal Board). So we had to reduce or keep whatever was requested and design a totally different and satisfying contemporary house to fit the character of neighborhood as well.

The outcome which gradually is finding its shape in real world, is absolutely satisfying, although the house is not that big but the layout is very unique.

Special thanks to the Client for giving us this opportunity and being so accurate and detail-oriented and loyal to the architectural design.

 
 
 

Recent Posts

See All

Comments


When nothing goes right... Go left!   

3429  Yonge St,  Toronto, ON,  M4N 2N1

416-835-7248   647-869-9356  647-979-6879

  • Black Twitter Icon
  • Black Google+ Icon
  • Black LinkedIn Icon
  • Black Houzz Icon
  • Black Instagram Icon
  • Black Facebook Icon
bottom of page